Archive

MULTI-UNIT INDUSTRIAL BUILD

New build industrial construction in Mount Maunganui.   A multi unit industrial building, where the design was required to accommodate precast concrete walls and mezzanine floors. Complex civil engineering design was required for challenging on site stormwater soakage.   DATE 2022

FLIWAYS COURIERS

Construction of a new premise for Fliways Couriers in Tauriko, Tauranga.  The design required specialised civil engineering to include pavements for heavy vehicles, stormwater and wastewater reticulation, and pavement level design to accommodate truck docks and existing site levels. DATE 2021

NEWLINE

Construction of a new premise for Newline in Tauriko, Tauranga.  The civil design for this build included site retaining walls, pavements for heavy vehicles, stormwater and wastewater reticulation. The structural design included a large warehouse area utilising Steltech welded steel portal frames, as well as a